Schedule Inspection
- « inspection results
- « Permit and approved plans are on-site and accessible to the inspector. (R105.7, R106.1.1, R106.3.1)
- « Accesses shall be in hallways or other readily accessible locations. (R807.1)
- « Permit information is correct (R106.1.1)
- « All exterior windows, penetrations, and openings caulked. (WSEC R402.4.1.2; R703.1.1)
- « Chimney terminations are 2 feet above any roof/structure within 10 feet and not less than 3 feet above the highest point.
- « Verify that deck placement, setback, size and materials are per approved plans. (R507.1)
- « Deck is positively attached and supports both lateral and live loads (40 pounds per square foot minimum). (R301.5, R507.8)
- « Garage door to house is weatherstripped. (WSEC R402.2.4)
- « Primary heat source cannot be woodstove. Any woodstove or pellet stove must be EPA certified. (R303.10.2, R303.10.3, WA Amendment)
- « Attic accesses required to areas exceeding 30 square feet and which have a vertical height of 30 inches or greater. (R807.1)
- « Status
- « Type
- Clear All Filters
Loading...